top of page

Temporary Shoring + Structural Framing Modifications

Kingsway, Burnaby, BC

Temporary structural support was installed to stabilize the existing building during nearby excavation activities. Work included anchoring, framing adjustments, beam-post installations, and safety inspections.

​

Scope of Work:

  • Structural inspection and layout verification

  • Beam and post installation using treated lumber

  • Anchor bolt installation and epoxy setting

  • Field adjustments for misaligned columns

  • Final safety and quality review

kingsway struc img 2.avif
bottom of page